Now the line tube is arranged and then traveled,Line tube requires horizontal vertical arrangement

Source:www.xysd023.com & nbsp & nbsp & nbsp & nbsp Release time: 2023-11-25
& emsp;& emsp; Hydropower in the decoration is a hidden project。If the quality is not qualified,It will bring a lot of trouble to our future life。The master of the decoration tells me,The details below must pay close attention。
& emsp; & emsp; 1. The distance between the hot and cold water pipe should be greater than 15 cm。
& emsp; & emsp; 2. The water road is below,The circuit is above,Avoid the circuit when avoiding water pipes。
& emsp; & emsp; 3. After laying the water pipe,Pressure test should be performed,Check whether the performance of the water pipe seal is tight。
& emsp; & emsp; 4. Install the S -type anti -odor curve under the basin,Prevent odor to float。
& emsp; & emsp; 5. After the kitchen and bathroom floor tiles are paved,Should be stored in water,See if the drainage of the floor drain is smooth。
& emsp; & emsp; 6. The lighting line adopts 1.5 square line,The socket uses 2.5 square line,Using 4 square wires,such as kitchen、bathroom、Each air conditioner should walk separately。
& emsp; & emsp; circuit construction steps
& emsp; & emsp; one step: bomb line
& emsp; & emsp; bomb lines are divided into horizontal lines and pipes。The purpose of the horizontal line is to install all switches and sockets on the same horizontal line,Convenient wiring,More beautiful; the direction line is to make the line horizontally vertically,More neat,Easy to maintain and check in the future,Avoid the latter damage and damage line。
& emsp; & emsp; two steps: slot
& emsp; & emsp; slot along the bomb line,General machine,can better guarantee the level of the wire slot、Vertical、Smooth,slot depth is not less than 25mm。
& emsp; & emsp; three steps: embedded bottom box and bottom box repair
& emsp; & emsp; after slotting,embedding the bottom box,The level deviation between the bottom box is not greater than 5mm。
& emsp; & emsp; after the bottom box is buried,Fix the gaps around,Fixed bottom box,Clean the inside of the bottom box。
& emsp; & emsp; four steps: fixed buckle
& emsp; & emsp; fixed buckle,After fixing the electric pipe,Make it not suitable for falling off。
& emsp; & emsp; five steps: tube wiring
& emsp; & emsp;,Line tube requires horizontal vertical arrangement,Aesthetic,It is convenient to find the position according to the circuit direction diagram,Convenient to maintain it later,Avoid accidentally damaging the pipeline in the future。During the arrangement of the wire,The interval between strong and weak electricity should be greater than 15cm,to avoid magnetic field interference。Pipeline bending angle、Special processing process at the intersection of strong and weak electricity,Special crafts on the wiring head。
& emsp; & emsp; ▲ Pipeline bending angle details: Moon bending process
& emsp; & emsp; control the curved angle when the corner of the wire tube turns> 90 °,This can reduce power,Make sure that the wires are upgraded or problems in the future,It can be more convenient to take out and replace。